15. Transient Surge Protection — due at Tropical 10/9
16. Landscaping — Peter's List
- High road trees
- High road waterfall — details required
- Line all roads with stones
- Pop's Garden — need deer protection — Danny suggested install a motion detector with a strobe light - the deer will
activate the light/sound — JE approved 9/24 — Danny will forward 10/5
- Shade cloth — on L.51 — Peter installed one for JE review
- Clean mess, cut grass; trim all vines, acacia — owner's drive, blue beach, gym — work in progress
- Peter to clean the sides of the road — work in progress
- Black Heli Under Pads — install at top of bike path at MC — not enough on site to complete project. Have located
dealer, require amount to order will review 10/3
- Review growth of sea grape - engineering area
- Hydroseed all pull box areas & engineering
- Take out the single tree in engineering - Peter might want to cut it, so not to damage lines
- PR Coconut Palms — planted at main entrance, blue beach (5), berm, Five Palms, MBR — completed 9/27
17. Roads
- General re-grading of roads — ongoing — Peter
- Betteroads quotes from triangle to crest of road above gym — Asphalt - $71,5000, Concrete - $103,600. Brice to review
details with Better Roads — week of 10/1
18. Library
- AC quote forwarded to Rich Barnett, who had design concerns, awaiting reply from vendor
19. New Employee Bathrooms
20. Gym
- New punching bag — installation of the speed bag on hold 9/22 - per JE until visit
• New front & back doors installation — will complete after visit
21. Beach Office
- complete electrical overall required
- waterproofing/sealing/painting/replace rotten wood required
22. LSJ Mooring — Darren forwarded to Army Corp for final approval — awaiting response
23. Hangar
- Fuel Containment Pad — draft approved, drainage incorporated — survey forwarded to the architect 9/18 - he will
complete the plan by 10/5, submit to DPNR for permitting (Cecile's update as of 9/21)
24. Steel shed — Buck Steel —JE approved mock-up 9/26, changes 9/27— Buck Steel working on the final specs/quote
25. Equipment to be Purchased
- (1) light generator, (2) arms with lights to be hard wired - quote due 10/5
- (1) skid steer on site — require forks, ordered 10/3
- (1) John Deere box and blade — Brice has recommended JD 5101E AWD — loader, scraper, digger, 100hp, enclosed cab
- (1) man-lift
- (2) golf cars — 2 seater
• (1) dump truck — JE approved purchase — 2012 Ford F450 - $15,000 deposit sent 9/25, shipment booked at Tropical
-(1) mini excavator
- (1) Jet ski trailer
26. LSJ Mats — for all locations — ordered 9/22
27. Engineering — start emptying/relocating items in remaining 20 foot containers 10/15
28. Stone Walls — Repair work to replace missing loose stones — Gerry & TJ — Danny to schedule them
29. Part Time Employees —M forwarded information of 2 potential part-time housekeepers to
9/25 —
to schedule meeting with them on 10/3
30. Heli Pad - reinstall windsock to north side of helipad - JE & Larry to review lights and windsock location when next
on site
EFTA_R1_01214946
EFTA02316358
--- PAGE 3 ---
31. Cisterns — need to be cleaned and sealed work to begin 11/1
32. Solar - lights installation COMPLETE - JE does not like the "white light", likes a "soft white" light —JE to review when
on site
• Solar quote reviewed with Rich, submitted to JE 9/17 — now researching line loss on cable, awaiting update
33. Master Bedroom — door sliders require waxing and alignment — to be completed after vist
EFTA_R1_01214947
EFTA02316359
--- SOURCE: IMAGES__0059__EFTA02316360.txt ---
METADATA_SOURCE: IMAGES0059
METADATA_FILENAME: EFTA02316360.pdf
----------------------------------------
From:
Sent:
Thursday, September 13, 2012 8:08 PM
To:
Jeffrey Epstein;
Cc:
Lesley Groff
Spa appointments have been booked at the Mission Inn Spa as follows:
Sept. 18th at 2pm: Jeffrey has Kelly's Fountain of Youth which is 2 =ours Sept. 18th at 2pm:
has a Hydrating
Marine Wrap(50 min) followed =y a Healing Massage(50 min) Sept. 19th at 1pm: I've booked a Healing Massage under
name(S0 =in)
I have all these held with my AmEx. You must cancel 12 hours in advance =r the previous day for no penalties
<?xml version=.0" encoding=TF-8"?>
<!DocTypE plist PUBLIC "I/Apple/MID PLIST 1.0//EN" "http://www.apple.com/DTDs/Propertylist-1.0.dtd">
<plist version=.0">
<dict>
</dict>
</plist>
EFTA_R1_01214989
EFTA02316360
--- SOURCE: IMAGES__0059__EFTA02316361.txt ---
METADATA_SOURCE: IMAGES0059
METADATA_FILENAME: EFTA02316361.pdf
----------------------------------------
From:
LSJ <
Sent:
Wednesday, October 10, 2012 1:32 PM
To:
Subject:
Re: Mirrored panels 5 palms
Hi
That would be great given we have used at least 6 different glues Thanks K
Sent from my iPhone
On Oct 7, 2012, at 11:18 AM,
<mailto
» wrote:
Ok. Do we also need the adhesive?